Skip to main content

Water & Sewer Department

Versailles Municipal Utilities (VMU) Water & Sewer

Water
The Versailles Water Treatment Plant, located on Tyrone Pike, has production capacity of 10 million gallons of water per day. We currently provide water to approximately 6,200 customers, including the South Woodford and Northeast Woodford Water Districts. The source of water for Versailles is Pool 5 of the Kentucky River. Continuous laboratory testing at both the water plant and at numerous sites throughout the distribution system ensures that all water treated at our plant exceeds state and federal standards.

Our distribution system consists of over 115 miles of water lines, four water tanks, 6,200 water meters (all of which are read the middle of every month), 1,500 water valves and 624 fire hydrants.

Sewer
The current Versailles Wastewater Treatment Plant has a design capacity of 3 million gallons per day and serves over 5,900 customers. In July of 2017, VMU began construction on a major upgrade and expansion of the plant. At a cost of nearly $20 million, it will increase capacity to 4.5 million gallons per day, thoroughly modernize and improve the methods in which wastewater is treated, and will represent the single largest project ever undertaken by the City of Versailles. Construction should be completed in the summer of 2019.

There are almost 100 miles of sewer line, 2,225 manholes, and 24 sewer lift stations in our sewer collection system. Our employees maintain an on-going pro-active collection system maintenance program, which includes cleaning and video-inspecting all sewer mains. In conjunction with the plant expansion, VMU is also making approximately $7 million of improvements to the collection system.

For more information about these sewer projects, and to see the information presented at the December 2015 Public Meeting on the subject, please click here: WWTP Power Pont.pptxWWTP Power Pont.pptx

Utility Rate Increases
To finance the sewer projects, the Versailles City Council implemented three sewer rate increases of 18.5%. The first two increases occurred on customers' March, 2016 and March, 2017 bills. The final increase will go into effect in March, 2018.

In order to provide the best services possible to our water and sewer customers, and to allow for increased costs for utilities, chemicals, personnel, etc., rates charged for water increase by 2% annually. Sewer rates will also increase by 2% annually, except for calendar years 2016, 2017, and 2018 in light of the specific rate increases for sewer service for those years.

Signing up for water/sewer service with Versailles Municipal Utilities:

In order to sign up for water/sewer service, you must visit the Versailles Municipal Utilities office located in City Hall at 196 South Main Street. This office is open Monday through Friday 8:00a.m. – 4:00p.m. Effective May 26, 2015, a $100.00 deposit is required for all customers. The deposit must be paid at the time you sign up for service. We only accept cash, check, or money order.

In order to have service placed in your name on the same day, you must come into the office by 2:30p.m. If you are moving from one location to another, within our service area, then your deposit will transfer to the new location. If you are going to have water service in your name at more than one location, then a deposit is required at each location. Please call us at (859) 873-5437 with any questions.

For additional information, including rates, please see the VMU Utility Info Sheet.pdf

Water/Sewer Service Information:

  • Water and sewer bills are mailed to customers on the 1st of each month. If you fail to receive a bill by the 5th of the month, please contact our office at (859) 873-5437.
  • Bills are due on the 15th of each month. If a bill is not paid by the close of business on the 15th of the month, then a 10% late fee is assessed. Any bill not paid by the close of business on the 25th of the month will have a $40.00 processing fee assessed in addition to any late fees that had already been assessed.
  • Termination of service on the 26th of each month if the bill has not been paid.
  • For your convenience, we have two drive up deposit boxes which are located in the front and rear of City Hall. These boxes may be used 24 hours a day for all payments to the City of Versailles.
  • We also offer automatic bank draft. This service is an easy and convenient way to pay your utility bill. You may come in and sign up for this service or download our bank draft form and drop it off at City Hall along with a voided check.
  • Click here to pay your bill online, with a credit or debit card.
  • Please note that if you choose the bill paying service offered by many banks, it may take 7-10 days for us to receive their check, resulting in your bill being paid "late".

Tap Fees

For new development and/or construction, water meters of various sizes are available for purchase. The rates for water meter taps are as follows:

  • ¾ inch = $2,000.00
  • 1 inch = $2,300.00
  • 1½ inch = $3,100.00
  • 2 inch = $3,500.00
  • Anything above 2 inch = $2,000.00 (plus contractor provides Sensus brand touch read meter)
  • The sewer tap charge is included in the water meter price
  • There is a $1,500.00 fee for sewer service where Versailles Municipal Utilities does not provide the water  

Versailles Water Plant
Ross Harrell
Water Plant Superintendent
US Highway 62
Firegate 85
Versailles, Kentucky 40383

(859) 873-5740 (Office)
(859) 879-3445 (Fax)
rharrell@versaillesky.com 

Water Distribution Manager
Michael Walton
196 South Main Street 
Versailles, Kentucky 40383
(859) 873-2245 ext. 127 (Office)
(859) 873-5969  (Fax)
mwalton@versaillesky.com

Versailles Wastewater Treatment
Plant
Ralph Ortt
Wastewater Plant Superintendent
336 Kentucky Avenue
Versailles, Kentucky 40383
(859) 873-3624 (Office)
rortt@versaillesky.com

 

 

 

 Online Water Payment.png
 

 

We are now accepting Online Water Payments